Metropolitan Nashville Airport Authority
The Terminal Garage and Administration Building
Project Description
The New Terminal Garage and Airport Administration Building will be built on the site of the existing Short-Term garage at Nashville International Airport. The new garage will consist of approximately 3,300 parking spaces on 6 levels, and include a two-story, 69,000 square foot Airport Administration Office Building on the top of the garage. A future phase will be built so that the garage will house a total of 4,800 parking spaces. Additionally, in a future phase, a hotel is planned to be built on top of the future Garage B addition.