Skip to main content

Archive

  1. High School Addition

    Comments Off on High School Addition

    This private school has finalized the final footprint of the high school. It is projected that 360 students will be enrolled in the updated 9-12 high school. The addition has been designed for five-year enrollment growth to 475.

  2. Student Library and Learning Center

    Comments Off on Student Library and Learning Center

    The contemporary, angular design draws you inward toward the main lobby space and up through a five-level atrium, which serves as the heart of the building.

  3. D.P. Culp Center Renovation and Addition

    Comments Off on D.P. Culp Center Renovation and Addition

    The 126,000 sf renovation converts a brutalist building into an open and flexible student center designed to elevate the transparency of the center’s activities. The building carefully blends into the existing fabric of the campus, while prioritizing a modern and high-performing façade.

  4. Englewood STEM High School

    Comments Off on Englewood STEM High School

    Moody Nolan, in collaboration with Design-Build partner Ujamaa-Power Joint Venture, designed and developed this new 160,000 sq. ft. high school located in Chicago’s Englewood community. The new school will help transform the landscape of Chicago’s Southside; envisioned as a modern campus intended to replace an existing, aging high school located on the site.

  5. STEAM and Connected Learning High School

    Comments Off on STEAM and Connected Learning High School

    Starting with a feasibility study led by Moody Nolan, the project consists of a phased renovation of an existing 127,000 sq. ft. college with a brand new athletic wing addition and new exterior play fields.